Filter Projects by:

Or Filter Projects by:

All Projects

Interstate 74 – redesign services
South Florida Water Management District – headquarters building
Illinois Air National Guard – composite support facility design
Indianapolis International Airport - runway & taxiway rehabilitation
Midwest power-generation station projects
BNSF Railway’s Memphis Intermodal Facility expansion
DuPage National Technology Park Cyber Continuity Center
Macon County Beltway
Town Branch sewer rehabilitation
Missouri River Freight Assessment
P&L Railway Bridge design and construction
Muscatatuck Urban Training Center
Interstate 64 Missouri River Bridge - new bridge design
Lake County Judicial Center – commissioning services
Li Ka Shing Knowledge Institute
Duke University – Levine Science Research Center
Charlotte County Airport design-build project
Caterpillar Inc. industrial projects
BNSF Railway – Canadian River bridge design
Indiana Hoosier SAFE-T – Emergency Communications System
Fairfield and Gilmer Interchange Improvement
Illinois Tollway’s Cherry Valley interchange
Metropolitan St. Louis Sewer District – watershed mapping
USACE hydrographic surveys
Muscatine Joint Readiness Center
Tri-State Tollway (I-294) reconstruction
University of Illinois at Springfield
USF Juniper-Poplar Residence Hall
Abraham Lincoln Capital Airport - architectural design services
Sarasota Bradenton International Airport
CWLP’s Dallman 4 – power-generating unit
BNSF bridge replacement over Des Moines River
City of New York – Emergency Radio Communications System
Kentucky Riverport Improvement
City of Rockford – Multilane Roundabout
U.S. Army Corps of Engineers - Roads Acting as Dams
Combined Service and Maintenance Support (CSMS) Bridging Documents
Clark Bridge - design services
FEMA Technical Assistance Contract
South Suburban Airport – land acquisition services
Waukegan National Airport
Liquefied natural gas tank projects
Chicago Region Environmental and Transportation Efficiency Program
International Broadcasting Bureau – Kuwait transmitting station
Capitol Avenue Corridor Improvements
Monarch-Chesterfield Levee flood-wall design
F-16 Engine Centralized Intermediate Repair Facility (CIRF)
Indiana State Route 641 Bypass design
Broward College – student affairs complex renovations
Pompano Beach Air Park
Sustainability paves way for Runway 2-20
Springfield Clinic Sixth Street expansion
Union Pacific Railroad - Global III Facility planning & design
U.S. Coast Guard - LORAN-C high-power transmitter stations
Outdoor Advertising Control Support Services
CWLP Spaulding Dam Spillway Gate Rehabilitation
Military Special Forces Centric Training Center design
Shiloh Readiness Center
Interstate 255 rehabilitation
Torrey Pines Molecular Research Center – commissioning services
DeKalb Taylor Municipal Airport – instrument landing system
Fermi National Accelerator Laboratory projects
BNSF Railway – Renton, Wash., railroad bridges replacement
International Broadcasting Bureau – A/E services worldwide
AT&T Reno, Nev., central office expansion
Raney Street relocation and extension
Lockport Lock and Canal Wall
Palm Beach Atlantic University
USF – central energy plant commissioning
Charlotte County Airport – general consultant services
Suffolk Construction Co.’s South Florida headquarters
Alaska Railroad Corp.’s Northern Rail Extension
Interstate 57 interchange
Lock 22 extension feasibility study
Selfridge Munitions Facility
State of Florida Special Needs Shelters
Leesburg International Airport
Valkaria Airport improvements
USACE Alaska Railhead Facility
Centennial Bridge traffic study and rehabilitation
Southern Illinois University at Edwardsville
Turlington Building
North Carolina Central University – building commissioning
Arcadia Municipal Airport
Naples Municipal Airport
National Precast Concrete Association – plant quality assurance audits
Tennessee Waterways Assessment Study
Southeast Iowa Regional Economic and Port Authority
Hillside Town Center development
Sandy Grove Middle School
PROJECT GALLERY

Lock 22 extension feasibility study

The U.S. Army Corps of Engineers, Rock Island District (USACE), selected Hanson to perform an engineering feasibility study, addressing navigation improvement planning for the Upper Mississippi River and Illinois Waterway System for the years 2000 to 2050.  The deliverable was a detailed report. 

The engineering feasibility study addressed the original design of Lock 22 and a lower guidewall extension.  Lock and Dam 22, located on the Mississippi River about nine miles downstream from Hannibal, Mo., was constructed from 1933 to 1938.

To obtain information for the study, Hanson investigated the subsurface conditions to document soil and rock engineering properties for the design of the lock extension from the existing 600-foot-long lock to a 1,200-foot-long lock.

Hanson’s team performed a geotechnical exploration program consisting of 31 geotechnical borings drilled from a barge on the river to depths ranging from 35 feet to 65 feet deep in soil and rock.  The typical geologic profile consisted of 15 feet of water, 7 feet of soil, and up to 40 feet of rock that was predominantly limestone but, in some circumstances, included some shale. 

Ten of the geotechnical borings obtained 4-inch-diameter rock core.  The team used the rock core to perform about 30 unconfined compression tests and about 90 triaxial tests at confining pressures up to 2,000 psi in accordance with ASTM D-2664.  Hanson’s team also performed 12 packer tests to determine the in situ hydraulic conductivity of the rock mass.

Working with the USACE, Hanson produced a geotechnical appendix to support the extension of Lock 22 and its lower guidewall.  The appendix addressed subsurface conditions and other engineering analyses – performed by Hanson – that were needed for inclusion in the report.

The detailed report included the following elements:

  • analysis of seepage and uplift,
  • guidelines for factors to be considered in the construction of the lock and guidewall extension,
  • recommendations for applicable rock excavation methods,
  • recommendations for soil and rock shear strength parameters, and
  • discussion of any unusual conditions that might impact design or construction.


Using information from the report, the USACE plans to incorporate the following into the construction phase of the project:

  • placing the lock and guidewall extension in the wet area,
  • extending the existing intermediate wall with a concrete-filled pile structure,
  • modifying the existing landslide guidewall for reuse as a lockwall, and
  • using concrete beams spanning cells for the lower guidewall.

Project Quick Facts

Client:

U.S. Army Corps of Engineers, Rock Island District

Location:

Hannibal, MO

Date Completed:

2000

Areas of Emphasis:

Levees, Flood Control & Dams Maritime & Inland Waterways U.S. Army Corps of Engineers

Services Provided:

Geotechnical Engineering Project Management Structural Engineering Water Resources Engineering