Filter Projects by:

Or Filter Projects by:

All Projects

Ameren Illinois Rivers transmission line river crossings
Interstate 74 – redesign services
South Florida Water Management District – headquarters building
Illinois Air National Guard facility design
Indianapolis International Airport services
CapX2020 Mississippi River T-Line Crossing
Monroe County Airport
Indianapolis International Airport - Taxiway B rehabilitation
Ameren Illinois Rivers Project
Midwest power-generation station projects
BNSF's Memphis Intermodal Facility expansion
DuPage National Technology Park Cyber Continuity Center
Macon County Beltway
Town Branch sewer rehabilitation
Missouri River Freight Assessment
P&L Railway Bridge design and construction
Muscatatuck Urban Training Center
Interstate 64 Missouri River Bridge - new bridge design
Springfield Airport Authority contract advisory services
Li Ka Shing Knowledge Institute
Lake County Judicial Center – commissioning services
Duke University – Levine Science Research Center
Charlotte County Airport design-build project
Caterpillar Inc. industrial projects
DHA BUILDER Asset Management System
BNSF Railway – Canadian River bridge design
Indiana Hoosier SAFE-T – Emergency Communications System
Fairfield and Gilmer Interchange Improvement
Illinois Tollway’s Cherry Valley interchange
Metropolitan St. Louis Sewer District – watershed mapping
USACE hydrographic surveys
Muscatine Joint Readiness Center
Tri-State Tollway reconstruction
University of Illinois at Springfield
SSM Health Good Samaritan Hospital
USF Juniper-Poplar Residence Hall
Abraham Lincoln Capital Airport - architectural design services
Sarasota Bradenton International Airport
Eastern Illinois University Renewable Energy Center
CWLP’s Dallman 4 – power-generating unit
BNSF bridge replacement over Des Moines River
City of New York – Emergency Radio Communications System
Kentucky Riverport Improvement
City of Rockford – Multilane Roundabout
U.S. Army Corps of Engineers - Roads Acting as Dams
Combined Service and Maintenance Support (CSMS) Bridging Documents
Clark Bridge - design services
FEMA Technical Assistance Contract
The Horace Mann Cos. retro-commissioning
South Suburban Airport – land acquisition services
Waukegan National Airport
Bowman Field
Liquefied natural gas tank projects
Sangamon County guaranteed energy savings contract
Chicago Region Environmental and Transportation Efficiency Program
International Broadcasting Bureau – Kuwait transmitting station
Capitol Avenue Corridor Improvements
Fort Hood Pavement Condition Surveys and Management Plan Updates
Monarch-Chesterfield Levee flood-wall design
F-16 Engine Centralized Intermediate Repair Facility (CIRF)
Indiana State Route 641 Bypass design
Broward College – student affairs complex renovations
Zora Neale Hurston Building retro-commissioning
Pompano Beach Air Park
Sustainability paves way for Runway 2-20
Blue Grass Airport
Springfield Clinic Sixth Street expansion
Union Pacific Railroad - Global III Facility planning & design
U.S. Coast Guard - LORAN-C high-power transmitter stations
Outdoor Advertising Control Support Services
CWLP Spaulding Dam Spillway Gate Rehabilitation
Military Special Forces Centric Training Center design
Shiloh Readiness Center
Interstate 255 rehabilitation
Torrey Pines Molecular Research Center – commissioning services
Rohde Building retro-commissioning
DeKalb Taylor Municipal Airport – instrument landing system
Fermi National Accelerator Laboratory projects
BNSF Railway – Renton, Wash., railroad bridges replacement
International broadcasting stations
AT&T Reno, Nev., central office expansion
Raney Street relocation and extension
Lockport Lock and Canal Wall
Palm Beach Atlantic University
USF – central energy plant commissioning
Orange County Public Schools commissioning and retro-commissioning
Charlotte County Airport – general consultant services
Suffolk Construction Co.’s South Florida headquarters
Anacacho Wind Farm
Papalote Creek Wind Farm, Phases I and II
Alaska Railroad Corp.’s Northern Rail Extension
Interstate 57 interchange
Lock 22 extension feasibility study
Selfridge Munitions Facility
State of Florida Special Needs Shelters
Leesburg International Airport
Valkaria Airport improvements
USACE Alaska Railhead Facility
Centennial Bridge traffic study and rehabilitation
Memorial Physician Services medical office
Southern Illinois University at Edwardsville
Turlington Building
North Carolina Central University – building commissioning
University of Florida East Campus Data Center
University of North Florida Biological Sciences Building
Arcadia Municipal Airport
Naples Municipal Airport
Simmons Cancer Institute
Florida Hospital Energy Roadmap Phase 1
Springfield Clinic 1st Expansion
Emiquon Preserve Water Control Structure
National Precast Concrete Association – plant quality assurance audits
Memorial Center for Learning and Innovation
Tennessee Waterways Assessment Study
Southeast Iowa Regional Economic and Port Authority
Hillside Town Center development
Sandy Grove Middle School
PROJECT GALLERY

CapX2020 Mississippi River T-Line Crossing

Hanson and POWER Engineers Inc. provided transmission line design services that helped Xcel Energy Inc. complete a critical Mississippi River crossing of the CapX2020 Hampton-Rochester-La Crosse 345-kilovolt project.

The goal of the CapX2020 program is to provide reliable and affordable electric service to Wisconsin, Minnesota and the surrounding region while expanding access to new power generation, including renewable energy. It involves the design and construction of about 800 miles of 230- and 345-kilovolt transmission lines at a cost of more than $2 billion. Eleven utilities, including Xcel Energy, are partners in CapX2020, which is the largest development of new transmission capacity in the region in more than 40 years. Xcel Energy is the managing partner for the 150-mile Hampton-Rochester-La Crosse transmission line.

The crossing, which was completed in February 2015 and cost $18 million, presented many challenges. The crossing is within the Upper Mississippi River National Wildlife and Fish Refuge, which is part of a primary bird migration route called the Mississippi Flyway. Vertical limitations for the line’s towers required that the conductors be at least 90 feet above water and the towers be below 200 feet in height. To minimize span lengths, one tower was placed on an island and another on a peninsula; transporting equipment and materials to those sites was done by barges and towboats. Helicopters pulled ropes across the river to string transmission lines and dropped off linemen on top of the towers.

Hanson’s design for the five tower foundations factored in the site’s harsh environment, providing scour protection and supporting the towers against wind, river flooding and ice. POWER’s team helped develop the overhead line design to meet CapX2020 requirements and environmental and navigation requirements from the U.S. Fish and Wildlife Service and U.S. Army Corps of Engineers. The new crossing improved the protection of birds along the flyway and has less potential for bird strikes.

Project Quick Facts

Client:

Xcel Energy Services, Inc.

Location:

Wabasha, MN to Buffalo, WI

Date Completed:

2015

Areas of Emphasis:

Power Delivery

Services Provided:

Geotechnical Engineering Structural Engineering Water Resources Engineering

Awards:

2016 American Council of Engineering Companies of Missouri, Grand Award

2016 American Council of Engineering Companies, National Recognition Award