Filter Projects by:

Or Filter Projects by:

All Projects

Ameren Illinois Rivers transmission line river crossings
Interstate 74 – redesign services
South Florida Water Management District – headquarters building
Illinois Air National Guard facility design
Indianapolis International Airport services
CapX2020 Mississippi River T-Line Crossing
Monroe County Airport
Indianapolis International Airport - Taxiway B rehabilitation
Ameren Illinois Rivers Project
Midwest power-generation station projects
BNSF's Memphis Intermodal Facility expansion
DuPage National Technology Park Cyber Continuity Center
Macon County Beltway
Town Branch sewer rehabilitation
Missouri River Freight Assessment
P&L Railway Bridge design and construction
Muscatatuck Urban Training Center
Interstate 64 Missouri River Bridge - new bridge design
Springfield Airport Authority contract advisory services
Li Ka Shing Knowledge Institute
Lake County Judicial Center – commissioning services
Duke University – Levine Science Research Center
Charlotte County Airport design-build project
Caterpillar Inc. industrial projects
DHA BUILDER Asset Management System
BNSF Railway – Canadian River bridge design
Indiana Hoosier SAFE-T – Emergency Communications System
Fairfield and Gilmer Interchange Improvement
Illinois Tollway’s Cherry Valley interchange
Metropolitan St. Louis Sewer District – watershed mapping
USACE hydrographic surveys
Muscatine Joint Readiness Center
Tri-State Tollway reconstruction
University of Illinois at Springfield
SSM Health Good Samaritan Hospital
USF Juniper-Poplar Residence Hall
Abraham Lincoln Capital Airport - architectural design services
Sarasota Bradenton International Airport
Eastern Illinois University Renewable Energy Center
CWLP’s Dallman 4 – power-generating unit
BNSF bridge replacement over Des Moines River
City of New York – Emergency Radio Communications System
Kentucky Riverport Improvement
City of Rockford – Multilane Roundabout
U.S. Army Corps of Engineers - Roads Acting as Dams
Combined Service and Maintenance Support (CSMS) Bridging Documents
Clark Bridge - design services
FEMA Technical Assistance Contract
The Horace Mann Cos. retro-commissioning
South Suburban Airport – land acquisition services
Waukegan National Airport
Bowman Field
Liquefied natural gas tank projects
Sangamon County guaranteed energy savings contract
Chicago Region Environmental and Transportation Efficiency Program
International Broadcasting Bureau – Kuwait transmitting station
Capitol Avenue Corridor Improvements
Fort Hood Pavement Condition Surveys and Management Plan Updates
Monarch-Chesterfield Levee flood-wall design
F-16 Engine Centralized Intermediate Repair Facility (CIRF)
Indiana State Route 641 Bypass design
Broward College – student affairs complex renovations
Zora Neale Hurston Building retro-commissioning
Pompano Beach Air Park
Sustainability paves way for Runway 2-20
Blue Grass Airport
Springfield Clinic Sixth Street expansion
Union Pacific Railroad - Global III Facility planning & design
U.S. Coast Guard - LORAN-C high-power transmitter stations
Outdoor Advertising Control Support Services
CWLP Spaulding Dam Spillway Gate Rehabilitation
Military Special Forces Centric Training Center design
Shiloh Readiness Center
Interstate 255 rehabilitation
Torrey Pines Molecular Research Center – commissioning services
Rohde Building retro-commissioning
DeKalb Taylor Municipal Airport – instrument landing system
Fermi National Accelerator Laboratory projects
BNSF Railway – Renton, Wash., railroad bridges replacement
International broadcasting stations
AT&T Reno, Nev., central office expansion
Raney Street relocation and extension
Lockport Lock and Canal Wall
Palm Beach Atlantic University
USF – central energy plant commissioning
Orange County Public Schools commissioning and retro-commissioning
Charlotte County Airport – general consultant services
Suffolk Construction Co.’s South Florida headquarters
Anacacho Wind Farm
Papalote Creek Wind Farm, Phases I and II
Alaska Railroad Corp.’s Northern Rail Extension
Interstate 57 interchange
Lock 22 extension feasibility study
Selfridge Munitions Facility
State of Florida Special Needs Shelters
Leesburg International Airport
Valkaria Airport improvements
USACE Alaska Railhead Facility
Centennial Bridge traffic study and rehabilitation
Memorial Physician Services medical office
Southern Illinois University at Edwardsville
Turlington Building
North Carolina Central University – building commissioning
University of Florida East Campus Data Center
University of North Florida Biological Sciences Building
Arcadia Municipal Airport
Naples Municipal Airport
Simmons Cancer Institute
Florida Hospital Energy Roadmap Phase 1
Springfield Clinic 1st Expansion
Emiquon Preserve Water Control Structure
National Precast Concrete Association – plant quality assurance audits
Memorial Center for Learning and Innovation
Tennessee Waterways Assessment Study
Southeast Iowa Regional Economic and Port Authority
Hillside Town Center development
Sandy Grove Middle School
PROJECT GALLERY

University of Florida East Campus Data Center

The University of Florida in Gainesville, Florida, built its new East Campus Data Center, a 25,000-square-foot facility, for supercomputing. When it opened in 2013, the $15 million center housed the $3.4 million HiPerGator and the university’s IT operations.

Two years later, the university expanded its supercomputing capabilities with HiPerGator 2.0, which adds an additional 30,000 cores to the 21,000-core HiPerGator. The original could perform up to 150 trillion calculations per second when it came online — the upgrade is seven times faster.

Hanson provided Leadership in Energy and Environmental Design (LEED®) pre-requisite and enhanced commissioning services for the center, addressing the building envelope as well as the mechanical, electrical and plumbing systems.

Hanson reviewed the building and systems’ design during development of the project’s construction documents. Hanson also provided Level 4 and Level 5 testing of the building’s controls; mechanical heating, ventilating and air conditioning systems; and electrical systems supporting the facility’s data halls. Level 4 testing determined that components and component systems were functional and met design requirements, subsequent to the completion of those systems’ construction. Load banks were used to simulate the design loads — electrical and heat gain (cooling) — expected from the maximum build-out of the data-center racks. Load testing was performed in steps over a period of time, which allowed the systems’ response to issues, such as power disturbances and temperatures, to be monitored. In addition, functional testing employed various fault testing scenarios, verifying system reliability and redundancy under normal and standby power.

Level 5 testing involved system integration tests at design loads, demonstrating correct performance of interacting systems under failure and maintenance conditions.

The university’s IT department worked with Dell Inc., Terascala, Mellanox Technologies and Advanced Micro Devices Inc. (AMD) to build the cluster. Hanson worked with the architecture/engineering team, KlingStubbins, during the design of the project and The Whiting-Turner Contracting Co. during the facility’s construction and system testing. The project was designed and constructed in accordance with the LEED new construction (LEED-NC) green building rating system, and achieved Certified status.

The data center, which can be expanded to more than three times its current capacity, is slated to include an additional 5,000 square feet of data center floor space, dual feed generator plant with 72 hours of fuel storage, dual feed UPS systems and inert gas fire suppression system. Hanson provided commissioning services for the expansion to the data center’s infrastructure, enabling an expansion of racks and computing capacity in Data Hall 2. The load in Data Hall 2 is projected to increase from 375 kilowatts to about 925 kilowatts. This increase requires an expansion of the chilled water distribution system requiring a new chiller, pump and computer room air handler units, switchgear, electrical busways, power distribution units and uninterruptible power supplies to serve the expanding data hall.

Project Quick Facts

Client:

University of Florida

Location:

Gainesville, FL

Date Completed:

2015

Areas of Emphasis:

Educational Buildings & Facilities

Services Provided:

Commissioning Electrical Engineering Mechanical Engineering

Testimonials:

"

It is refreshing to work with a Cx company that is there to get the job done right. Hanson's Cx people worked as a team with Whiting-Turner on the UF East Campus Data Center. Not only did they help to identify issues, but they also worked closely with our people in the field to get them resolved quickly.

" ~Brent A. Voyles, Vice President