Filter Projects by:

Or Filter Projects by:

All Projects

Interstate 74 – redesign services
South Florida Water Management District – headquarters building
Illinois Air National Guard – composite support facility design
Indianapolis International Airport - runway & taxiway rehabilitation
Midwest power-generation station projects
BNSF Railway’s Memphis Intermodal Facility expansion
DuPage National Technology Park Cyber Continuity Center
Macon County Beltway
Town Branch sewer rehabilitation
Missouri River Freight Assessment
P&L Railway Bridge design and construction
Muscatatuck Urban Training Center
Interstate 64 Missouri River Bridge - new bridge design
Li Ka Shing Knowledge Institute
Lake County Judicial Center – commissioning services
Duke University – Levine Science Research Center
Charlotte County Airport design-build project
Caterpillar Inc. industrial projects
BNSF Railway – Canadian River bridge design
Indiana Hoosier SAFE-T – Emergency Communications System
Fairfield and Gilmer Interchange Improvement
Metropolitan St. Louis Sewer District – watershed mapping
Illinois Tollway’s Cherry Valley interchange
USACE hydrographic surveys
Muscatine Joint Readiness Center
Tri-State Tollway (I-294) reconstruction
University of Illinois at Springfield
USF Juniper-Poplar Residence Hall
Abraham Lincoln Capital Airport - architectural design services
Sarasota Bradenton International Airport
CWLP’s Dallman 4 – power-generating unit
BNSF bridge replacement over Des Moines River
City of New York – Emergency Radio Communications System
Kentucky Riverport Improvement
City of Rockford – Multilane Roundabout
U.S. Army Corps of Engineers - Roads Acting as Dams
Combined Service and Maintenance Support (CSMS) Bridging Documents
Clark Bridge - design services
FEMA Technical Assistance Contract
South Suburban Airport – land acquisition services
Liquefied natural gas tank projects
Chicago Region Environmental and Transportation Efficiency Program
International Broadcasting Bureau – Kuwait transmitting station
Capitol Avenue Corridor Improvements
Monarch-Chesterfield Levee flood-wall design
F-16 Engine Centralized Intermediate Repair Facility (CIRF)
Indiana State Route 641 Bypass design
Broward College – student affairs complex renovations
Pompano Beach Air Park
Sustainability paves way for Runway 2-20
Springfield Clinic Sixth Street expansion
Union Pacific Railroad - Global III Facility planning & design
U.S. Coast Guard - LORAN-C high-power transmitter stations
CWLP Spaulding Dam Spillway Gate Rehabilitation
Outdoor Advertising Control Support Services
Military Special Forces Centric Training Center design
Shiloh Readiness Center
Interstate 255 rehabilitation
Torrey Pines Molecular Research Center – commissioning services
DeKalb Taylor Municipal Airport – instrument landing system
Fermi National Accelerator Laboratory projects
BNSF Railway – Renton, Wash., railroad bridges replacement
AT&T Reno, Nev., central office expansion
International Broadcasting Bureau – A/E services worldwide
Raney Street relocation and extension
Lockport Lock and Canal Wall
Palm Beach Atlantic University
USF – central energy plant commissioning
Charlotte County Airport – general consultant services
Suffolk Construction Co.’s South Florida headquarters
Alaska Railroad Corp.’s Northern Rail Extension
Interstate 57 interchange
Lock 22 extension feasibility study
Selfridge Munitions Facility
State of Florida Special Needs Shelters
USACE Alaska Railhead Facility
Centennial Bridge traffic study and rehabilitation
Southern Illinois University at Edwardsville
Turlington Building
North Carolina Central University – building commissioning
National Precast Concrete Association – plant quality assurance audits
Tennessee Waterways Assessment Study
Southeast Iowa Regional Economic and Port Authority
Hillside Town Center development
Sandy Grove Middle School
PROJECT GALLERY

Charlotte County Airport design-build project

When the Charlotte County Airport in Punta Gorda, Fla., quickly needed to make accommodations for a new airline, they chose Hanson for a unique design-build project. 

The design-build project, which included paving, lighting, signage and pavement marking services, was designed and built in four months.  Additionally, all services were completed while working around the existing airport operations.

The project entailed demolishing and removing the existing concrete; installing new, 12-inch thick, reinforced concrete; expanding the apron and adding an additional connector to meet new aircraft turning criteria; and painting ramp markings to accommodate the new aircraft. 

Hanson also completed a 500-foot-long taxiway addition to one of the runway ends to provide more flexibility for the airport’s two intersecting runways. The team also helped update runway numbers and signage.

Project Quick Facts

Client:

Charlotte County Airport Authority

Location:

Punta Gorda, FL

Date Completed:

2008

Areas of Emphasis:

Aviation Local Government/Municipal

Services Provided:

Electrical Engineering Program Management Project Delivery Project Management Transportation Engineering