Filter Projects by:

Or Filter Projects by:

All Projects

Interstate 74 – redesign services
South Florida Water Management District – headquarters building
Illinois Air National Guard – composite support facility design
Indianapolis International Airport - runway & taxiway rehabilitation
Midwest power-generation station projects
BNSF Railway’s Memphis Intermodal Facility expansion
DuPage National Technology Park Cyber Continuity Center
Macon County Beltway
Town Branch sewer rehabilitation
Missouri River Freight Assessment
P&L Railway Bridge design and construction
Muscatatuck Urban Training Center
Interstate 64 Missouri River Bridge - new bridge design
Li Ka Shing Knowledge Institute
Lake County Judicial Center – commissioning services
Duke University – Levine Science Research Center
Charlotte County Airport design-build project
Caterpillar Inc. industrial projects
BNSF Railway – Canadian River bridge design
Indiana Hoosier SAFE-T – Emergency Communications System
Fairfield and Gilmer Interchange Improvement
Metropolitan St. Louis Sewer District – watershed mapping
Illinois Tollway’s Cherry Valley interchange
USACE hydrographic surveys
Muscatine Joint Readiness Center
Tri-State Tollway (I-294) reconstruction
University of Illinois at Springfield
USF Juniper-Poplar Residence Hall
Abraham Lincoln Capital Airport - architectural design services
Sarasota Bradenton International Airport
CWLP’s Dallman 4 – power-generating unit
BNSF bridge replacement over Des Moines River
City of New York – Emergency Radio Communications System
Kentucky Riverport Improvement
City of Rockford – Multilane Roundabout
U.S. Army Corps of Engineers - Roads Acting as Dams
Combined Service and Maintenance Support (CSMS) Bridging Documents
Clark Bridge - design services
FEMA Technical Assistance Contract
South Suburban Airport – land acquisition services
Liquefied natural gas tank projects
Chicago Region Environmental and Transportation Efficiency Program
International Broadcasting Bureau – Kuwait transmitting station
Capitol Avenue Corridor Improvements
Monarch-Chesterfield Levee flood-wall design
F-16 Engine Centralized Intermediate Repair Facility (CIRF)
Indiana State Route 641 Bypass design
Broward College – student affairs complex renovations
Pompano Beach Air Park
Sustainability paves way for Runway 2-20
Springfield Clinic Sixth Street expansion
Union Pacific Railroad - Global III Facility planning & design
U.S. Coast Guard - LORAN-C high-power transmitter stations
Outdoor Advertising Control Support Services
CWLP Spaulding Dam Spillway Gate Rehabilitation
Military Special Forces Centric Training Center design
Shiloh Readiness Center
Interstate 255 rehabilitation
Torrey Pines Molecular Research Center – commissioning services
DeKalb Taylor Municipal Airport – instrument landing system
Fermi National Accelerator Laboratory projects
BNSF Railway – Renton, Wash., railroad bridges replacement
International Broadcasting Bureau – A/E services worldwide
AT&T Reno, Nev., central office expansion
Raney Street relocation and extension
Lockport Lock and Canal Wall
Palm Beach Atlantic University
USF – central energy plant commissioning
Charlotte County Airport – general consultant services
Suffolk Construction Co.’s South Florida headquarters
Alaska Railroad Corp.’s Northern Rail Extension
Interstate 57 interchange
Lock 22 extension feasibility study
Selfridge Munitions Facility
State of Florida Special Needs Shelters
Leesburg International Airport
Valkaria Airport improvements
USACE Alaska Railhead Facility
Centennial Bridge traffic study and rehabilitation
Southern Illinois University at Edwardsville
Turlington Building
North Carolina Central University – building commissioning
Arcadia Municipal Airport
Naples Municipal Airport
National Precast Concrete Association – plant quality assurance audits
Tennessee Waterways Assessment Study
Southeast Iowa Regional Economic and Port Authority
Hillside Town Center development
Sandy Grove Middle School
PROJECT GALLERY

Capitol Avenue Corridor Improvements

Anchored by residential areas east of 12th Street and the Illinois State Capitol to the west, Capitol Avenue is a unique transportation corridor, serving as a traffic artery – carrying approximately 5,000 vehicles per day – as well as a ceremonial corridor.

In 2002, the Regional/Urban Design Assistance Team delivered a report to the city of Springfield emphasizing the importance of renovating Capitol Avenue to revitalize Springfield’s downtown.

The city of Springfield, Ill., selected Hanson to provide design and streetscape improvements for Capitol Avenue’s redevelopment.  Hanson’s services included corridor development, planning, surveying, geotechnical analysis, traffic impact studies and contract document preparation for the project. An in-depth community involvement program also was included to increase public input for this high-profile project.

Critical to the success of the Capitol Avenue improvement project was recognizing strategic connections that link the avenue to downtown attractions and activity areas, including historic sites, commercial and entertainment areas, and adjacent residential neighborhoods. Identifying these elements required discussions with the city of Springfield, downtown business property owners, the Illinois Historic Preservation Agency, downtown interest groups and the state of Illinois.

To respect the monumental scale of the Capitol, Hanson’s team developed the street and the walkways as one grand promenade, eliminating the parallel parking while providing two lanes for the movement of vehicular traffic. Intentionally minimizing the division between vehicles and pedestrians yet functionally respecting these conflicting uses, this 80-foot-wide corridor is the stage for special events. Traffic signals, tied to the city's traffic control system, are being replaced at intersections. Curb extensions are being constructed at all intersections to reduce pedestrian crossing distances and enhance the distinctive quality of the new corridor.

A roundabout – the first of its kind in Springfield – is being constructed at the intersection of Capitol Avenue and 12th Street, representing the transition from the downtown business district to the east-side residential area. This renovated corridor has enhanced the downtown area for tourists, citizens and businesses alike.

The Capitol Avenue corridor redevelopment was inspired by an integrated design philosophy, which respects the story of the Capitol, reflects the spirit of the community, and creates a catalyst for economic development. The revitalized street provides the Capitol with a red carpet-stimulating opportunity for community life, social interactions and interpretation of the story of Illinois, Springfield and its residents.

Project Quick Facts

Client:

City of Springfield

Location:

Springfield, IL

Date Completed:

2011

Areas of Emphasis:

DOT & Tollway Streets & Arterials

Services Provided:

Impact Assessments Water, Stormwater & Wastewater Geotechnical Engineering Planning Project Delivery Project Management Structural Engineering Surveying Transportation Engineering

Awards:

2010 American Society of Civil Engineers' (ASCE) Central Illinois Section, Outstanding Civil Engineering Achievement (OCEA) Award